This isn't the same question as "should we modernize or rebuild." That's a decision about how much of the system to change. This is a decision about how to deliver whatever change you've already decided on - all at once, on a single cutover date, or in stages that each get validated before the next one starts. The two approaches carry very different risk profiles, and the right one depends on specifics of your system, not a general preference.
What big-bang actually front-loads
A big-bang migration builds the entire replacement system in parallel with the old one, then cuts over on a single date. It can be faster in calendar time when it works. The problem is where the risk sits: everything gets tested in isolation until the cutover, and the cutover is the first time the new system runs under real production conditions, real data volume, and real edge cases nobody thought to write a test for. If something's wrong, you find out on the worst possible day - after most of the budget is spent and the old system may already be decommissioned.
What a phased approach does instead
A phased approach breaks the migration into stages - database first, then architecture, then frontend, for example - and validates each stage against the live system before the next one starts. It takes longer in calendar time, generally. What it buys is that a problem surfaces while it's still cheap to fix, and while the old system is still there as a fallback.
We used exactly this ordering on a 10-year-old point-of-sale system for a multi-restaurant client: database migration first, from MySQL to PostgreSQL, then the architecture transformation to .NET Core microservices, then the frontend rebuild in React - with the new system run in parallel against the old one at every stage before cutover. An assessment of that system going in found a monolithic codebase with no documentation and no defined architecture, and those findings specifically ruled out a big-bang rewrite in favor of the phased, database-first approach - the system's own condition made the decision, not a default preference for one method over the other.
On a logistics client's operations dashboard, we took the same principle further: modernized the application layer, then the database indexing and caching, then the infrastructure, entirely incrementally, with zero downtime across the whole migration - the client's team kept operating the system the entire time.
When big-bang is actually the more sensible choice
Phased isn't automatically correct either. A smaller system, a short-lived internal tool, or a system with real, generous downtime tolerance can sometimes be replaced faster and cheaper in one pass than the coordination overhead of staging a migration would cost. The deciding factors are usually: how large and interconnected the system is, how much downtime the business can actually absorb, and how well-understood the existing codebase is going in. A well-documented, loosely-coupled system is a reasonable big-bang candidate. An undocumented, tightly-coupled, business-critical one usually isn't.
What actually decides it
The honest answer is that this isn't a preference call - it's something an assessment of your specific system should determine, based on documentation quality, architectural coupling, and how much downtime tolerance you actually have. Both of the migrations above ran phased because the assessment findings pointed there, not because phased is always the safer-sounding answer.
If you want a real recommendation instead of a default, that starts with an assessment of your system.